2007 Archive
Formal documents about the 2007 NEEM activities can be found in the menu to the left.
- The Field season plan is the final plan for the field work, and contains a description of the objectives of the field season, a list of the participants, and various practical and technical information.
- NEEM Field Season Report includes SITREPS.
- The SITREPs are weekly situation reports that summarize the main activities together with personnel and cargo movements.
- The NEEM project is managed by a Steering Committee (SC). The SC has one or two annual meetings, from which minutes and other relevant material is available.